GENERAL PLANNING FRAMEWORK
Roof replacement:
connect the next steps.
Put the scope, sequence, purchases and money in one plan. Keep assumptions separate from confirmed requirements.
Inspect before you price
Ask the roofer to confirm the condition of the deck, flashing, ventilation and any rot before agreeing a fixed price. Record allowances for replacing damaged sheathing separately from the main quote.
Check whether a permit applies
Re-roofing rules differ: some places require a permit for any re-roof, others only for structural changes or a change of material. Confirm with the authority, especially for heritage properties and conservation areas.
Plan around weather and access
Roof work depends on dry weather and safe access. Keep a buffer in the plan, agree where materials and waste bins will go, and record who is responsible for protecting gardens and gutters.
Keep warranty records
Record manufacturer and workmanship warranties, product names and installation dates at handover. They matter for insurance and resale.
These are general workflow suggestions, not a construction method, design, code interpretation or local cost estimate. Template durations are illustrative and have not been reviewed for your property. Ask qualified professionals and the responsible authority to confirm what applies.